Tesla Model 3: Cover - Penthouse (Remove and Replace) - Install
Install
Caution:
Replace all patchbolts.
Replace all nyloc nuts.
- Use an IPA wipe to clean any residue from the high voltage controller
mounting bolt holes and both the inside and outside of the penthouse cover
at the bolt holes.
- If the aluminum tape retrofit patch is damaged, remove it, clean the
area with an IPA wipe, apply another 50mm x 50mm patch of aluminum tape, and
wet out the patch with a silicone roller to set the adhesive.
- Use IPA wipes to clean the mating surface of the HV battery and the
penthouse cover gasket.
- Remove the logic connector cap from the high voltage controller
connector.
- Install the penthouse cover on the HV battery, and then hand-tighten the
bolts.
Note: Different penthouse cover revisions have 28, 18, or 16 bolts.
- Reinstall the logic connector cap onto the high voltage controller
connector.
28-Bolt Penthouse Cover Torque Sequence
- Torque the penthouse cover bolts in the sequence shown, and mark each
with a green paint pen as they are torqued.
Torque 8 Nm
18-Bolt Penthouse Cover Torque Sequence
16-Bolt Penthouse Cover Torque Sequence
- Connect the positive 12V output cable to the DCDC passthrough, install a
new nut to attach the cable, and mark the nut with a green paint pen after
torque.
Torque 9 Nm
Caution:
Make sure that the rubber boot is not trapped under the cable lug or
pinched between the cable lug and nut.
- Replace the cover on the positive 12V output cable at the DCDC
passthrough, and then press down to attach the cover.
28-Bolt Penthouse Cover
Retrofit Patch, 18-Bolt, and 16-Bolt Penthouse Covers
- Install and hand-tighten new bolts that attach the high voltage
controller internally to the penthouse cover.
Retrofit Patch, 18-Bolt, and 16-Bolt Penthouse Covers
28-Bolt Penthouse Cover
Retrofit Patch, 18-Bolt, and 16-Bolt Penthouse Covers
- Torque the high voltage controller to penthouse cover bolts in the
sequence shown, and mark each bolt with a green paint pen as they are
torqued. Torque Plastisol Gasket Bolts 5 Nm +90 deg
Torque Gasketless Bolts 5 Nm +20 deg
Caution: Insufficient torque of bolts 1 and 2 opens the high
voltage interlock loop circuit.
- Perform a penthouse air leak test. See
Penthouse Air Leak Test.
- Install and hand-tighten the adjustable elements (x4) on the penthouse
cover counter-clockwise so that they are fully engaged.
Caution: Hand-tighten only.
- Install the penthouse rails to the body and penthouse cover, and then
install and hand-tighten the bolts that attach the rails to the body and
cover.
- Torque the bolts to specification.
Torque 24 Nm
Torque 24 Nm
Torque 24 Nm
- Install the center 2nd row buckle. See
Buckle - 2nd Row - Center (Remove and Replace).
- Install the LH 2nd row buckle. See
Buckle - 2nd Row - LH (Remove and Replace).
- Connect the charge port electrical harness to the penthouse DC input
connector. Close the locking handle and slide the security tab to the lock
position.
- Fasten the clip that attaches the charge port electrical harness to the
vehicle.
- Install the charge port to HV battery harness bracket to the body, and
install the bolts that attach the bracket to the body.
Torque 10 Nm
- Fasten the clips that attach the low voltage electrical harness to the
charge port to HV battery harness bracket at the penthouse.
- Install the LH rear sill panel trim. See
Trim - Sill Panel - Rear - LH (Remove and Replace).
- Install the foam cover to the LH side of the penthouse.
- Connect 12V power. See
12V Power (Disconnect and Connect).
READ NEXT:
Remove
Connect a laptop with Toolbox 3 to the vehicle.
In Toolbox, click in the Search field, and then click Tools.
From the Tools menu, click Active Alerts.
Click Read Alerts and check for a B
Install
Use an IPA wipe to clean the area around the openings where the flood
ports were removed.
Install a 2nd generation flood port into the opening at the LH underside
of the HV battery
SEE MORE:
Install
Install the A/C compressor fuse to the RH penthouse bus, and then
install new nuts to attach the fuse to the bus.
Torque 2.5 Nm
Generic Measurement - Actual busbars and fasteners might appear
different
Use the Hioki resistance meter to measure the resistance at the HV joint
b
Install
With an assistant, position the HVAC assembly into the vehicle.
Note: Align the drain hose and TXV housing.
Install the bolt that attaches the lower LH side HVAC assembly to the
vehicle. Torque
5.5 Nm
Push the PTC heater harness through the bulkhead, and then install the
grommet