Fuse - Cabin Heater - HV Battery- Remove

Fuse - Cabin Heater - HV Battery (Remove and Replace)

SPECIAL TOOLS

Ratchet, 1/4" Sq Dr, HV Insulated (1057602-00-A)

Ext Bar, Wobble, 1/4" Dr, HV Insulated (1057603-00-A)

Skt, 1/4" Sq Dr, 8mm, HV Insulated (1057604-00-A)

Magnet, Flexible, HV Insulated, 18" (1057607-00-A)

Asy, Service Cover, Penthouse, Model 3 (1127845-00-A)

Warning:

Only technicians who have been trained in High Voltage Awareness are permitted to perform this procedure. Proper personal protective equipment (PPE) and insulating HV gloves with a minimum rating of class 0 (1000V) must be worn at all times a high voltage cable, busbar, or fitting is handled. Refer to Tech Note TN-15-92-003, "High Voltage Awareness Care Points" for additional safety information.

Remove

  1. Remove the pyrotechnic battery disconnect from the penthouse. See Pyrotechnic Battery Disconnect (Remove and Replace).

Fuse - Cabin Heater - HV Battery- Remove

  1. Raise the high voltage controller, release the clips that attach the fuse access insulator to the RH penthouse bus cover, and remove the insulator.

Fuse - Cabin Heater - HV Battery- Remove

  1. Remove and discard the nuts that attach the PTC heater fuse to the RH penthouse bus and remove the fuse. 

Fuse - Cabin Heater - HV Battery- Install

Install

Fuse - Cabin Heater - HV Battery- Install

  1. Install the PTC heater fuse to the RH penthouse bus, and then install new nuts to attach the fuse to the bus. Torque 2.5 Nm

Generic Measurement - Actual busbars and fasteners might appear different Generic Measurement - Actual busbars and fasteners might appear different

  1. Use the Hioki resistance meter to measure the resistance at the HV joint between the penthouse bus and the LH side of the PTC heater fuse body .

Note: The maximum acceptable resistance is 0.105 mΩ (105 μΩ). If the resistance is above this value, escalate a Toolbox session, as appropriate.

Generic Measurement - Actual busbars and fasteners might appear different Generic Measurement - Actual busbars and fasteners might appear different

  1. Use the Hioki resistance meter to measure the resistance at the HV joint between the RH side of the PTC heater fuse and the respective ring terminal plating.

Note: The maximum acceptable resistance is 0.145 mΩ (145 μΩ). If the resistance is above this value, escalate a Toolbox session, as appropriate.

Fuse - Cabin Heater - HV Battery- Install

  1. Install the fuse access insulator on the RH penthouse bus cover, fasten the clips that attach the insulator to the cover, and lower the high voltage controller.
  2. Install the pyrotechnic battery disconnect into the penthouse. See Pyrotechnic Battery Disconnect (Remove and Replace).

    READ NEXT:

     Fuse - Power Conversion System - HV Battery (Remove and Replace)

    Fuse - Power Conversion System - HV Battery- Remove SPECIAL TOOLS Ratchet, 1/4" Sq Dr, HV Insulated (1057602-00-A) Ext Bar, Wobble, 1/4" Dr, HV Insulated (1057603-00-A) Skt, 1/4" Sq Dr, 8mm, HV Ins

    SEE MORE:

     Check Base - Sun Visor - Driver (Remove and Replace)

    Remove Remove the LH instrument panel end cap. See End Cap - Instrument Panel - LH (Remove and Replace). Release the clips that attach the LH air wave end cap to the main instrument panel decor trim, and then remove the cap from the vehicle. Install Installation procedure is the rev

     Seal - Oil - Differential to Halfshaft - Rear Drive Unit - LH (Remove and Replace)

    SPECIAL TOOLS Adapter, Coolant Reservoir Pressure Test (1130942-00-B) Install Tool, Output Seal, Model 3 (1131206-00-A) Remove Remove the LH rear drive unit halfshaft. See Halfshaft - Rear Drive Unit - LH (Remove and Replace). Use the special tool to remove the LH output seal from the re

    © 2019-2025 Copyright www.tmodel3.com